|
Technical
|
|
01
|
Introduction to deepwater drilling environments
|
€8.00
|
704kb
|
|
|
02
|
Deepwater risk analysis method
|
€6.00
|
128kb
|
|
|
03
|
Deepwater well design outline
|
€5.00
|
47kb
|
|
|
04
|
Deepwater drilling operations (ops guidelines)
|
€12.00
|
138kb
|
|
|
05
|
Rules of thumb to meet deepwater drilling objectives
|
€9.00
|
171kb
|
|
|
06
|
Overview of riserless drilling and new technology methods
|
€7.00
|
448kb
|
|
|
07
|
How to addressing deepwater geo-hazards
|
€15.00
|
69kb
|
|
|
08
|
Pressure prediction for shallow water flow (article)
|
Free
|
43kb
|
|
|
09
|
Pore and fracture pressure determination
|
Free
|
45kb
|
|
|
10
|
Deepwater casing design aspects |
€5.00
|
43kb
|
|
| 11 |
Deepwater bits and hole enlarging considerations |
€9.00 |
149kb |
|
| 12 |
Deepwater drilling equipment needs and requirements |
€6.00 |
275kb |
|
| 13 |
Dual activity drilling overview |
€5.00 |
180kb |
|
| 14 |
Managing deepwater drilling developments |
€8.00 |
66kb |
|
| 15 |
Pre-planning
pays off! |
Free |
355kb |
|
| 16 |
Well
planning evaluation pays off! |
Free |
138kb |
|
| 17 |
IADC Riser disconnect guidelines supplement |
€3.00 |
93kb |
|
| 18 |
Active
heave compensator article |
Free |
15kb |
|
| 19 |
|
|
|
|
|
Worked examples, calculations, theory and formulae
|
|
20
|
Maximum load on block no amplification (floating rig)
|
€2.00
|
38kb
|
|
|
21
|
Dynamic load amplification hook loads (floating rig)
|
€3.00
|
45kb
|
|
|
22
|
Derrick loading while running BOP (un damped)
|
€3.00
|
74kb
|
|
|
23
|
Dynamic casing loads from a floating rig (damped system)
|
€3.00
|
57kb
|
|
|
24
|
Evaluating deepwater shallow kill mud requirements
|
€2.00
|
37kb
|
|
|
25
|
Fracture gradient estimation
|
€2.00
|
31kb
|
|
|
26
|
Dual gradient riser mud boost calculation
|
€2.00
|
33kb
|
|
|
27
|
Dual gradient drilling riser boost while tripping evaluation |
€2.00
|
34kb |
|
|
28
|
Mud mat capacity? |
€2.00
|
36kb |
|
| 29 |
Conductor set down test evaluation |
€3.00 |
47kb |
|
| 30 |
Soil resistance calculations while jetting |
€3.00 |
58kb |
|
| 31 |
WOB evaluation while jetting? |
€3.00 |
46kb |
|
| 32 |
Set up time after jetting conductor? |
€4.00 |
70kb |
|
| 33 |
Bending load no deflection |
€2.00 |
35kb |
|
| 34 |
Structural string combined loading evaluation |
€3.00 |
43kb |
|
| 35 |
Riser-less drilling cuttings concentration and ROP evaluation |
€2.00 |
38kb |
|
| 36 |
Dual gradient mud mix calculations |
€2.00 |
36kb |
|
| 37 |
Dynamic drilling mud cost evaluation |
€3.00 |
38kb |
|
| 38 |
|
|
|
|
|
Mathcad Worksheets, Requires
MATHCAD-11 SOFTWARE to be used
|
|
39
|
Maximum load on block no amplification (floating rig)
|
€3.00
|
12kb
|
|
|
40
|
Dynamic load amplification hook loads (floating rig)
|
€4.00
|
16kb
|
|
|
41
|
Derrick loading while running BOP (un damped)
|
€4.00
|
16kb
|
|
|
42
|
Dynamic casing loads from a floating rig (damped system)
|
€4.00
|
38kb
|
|
|
43
|
Evaluating deepwater shallow kill mud requirements
|
€3.00
|
24kb
|
|
|
44
|
Fracture gradient estimation |
€3.00
|
10kb |
|
|
45
|
Dual gradient riser mud boost calculation |
€4.00
|
12kb |
|
|
46
|
Dual gradient drilling riser boost while tripping evaluation |
€4.00
|
09kb |
|
|
47
|
Mud mat capacity? |
€4.00 |
09kb |
|
|
48
|
Conductor set down test evaluation |
€5.00 |
16kb |
|
| 49 |
Soil resistance calculations while jetting |
€6.00 |
16kb |
|
| 50 |
WOB evaluation while jetting? |
€7.00 |
17kb |
|
| 51 |
Set up time after jetting conductor? |
€8.00 |
28kb |
|
| 52 |
Bending load no deflection |
€3.00 |
67kb |
|
| 53 |
Structural string combined loading evaluation |
€5.00 |
16kb |
|
| 54 |
Riser-less drilling cuttings concentration and ROP evaluation |
€4.00 |
12kb |
|
| 55 |
Dual gradient mud mix calculations |
€4.00 |
13kb |
|
| 56 |
Dynamic drilling mud cost evaluation |
€6.00 |
16kb |
|
| 57 |
|
|
|
|
| 58 |
|
|
|
|
| 59 |
|
|
|
|
| Needs, requirements?
complete the request
form or e-mail
us. |