number crunching
click here to advertise on this website
welcome to kingdom drilling

 

Section 18; Deepwater drilling

Needs, requirements? complete the request form or e-mail us.

Technical

01

Introduction to deepwater drilling environments

€8.00

704kb

02

Deepwater risk analysis method

€6.00

128kb

03

Deepwater well design outline

€5.00

47kb

04

Deepwater drilling operations (ops guidelines)

€12.00

138kb

05

Rules of thumb to meet deepwater drilling objectives

€9.00

171kb

06

Overview of riserless drilling and new technology methods

€7.00

448kb

07

How to addressing deepwater geo-hazards

€15.00

69kb

08

Pressure prediction for shallow water flow (article)

Free

43kb

 

09

Pore and fracture pressure determination

Free

45kb

 

10

Deepwater casing design aspects €5.00 43kb
11 Deepwater bits and hole enlarging considerations €9.00 149kb
12 Deepwater drilling equipment needs and requirements €6.00 275kb
13 Dual activity drilling overview €5.00 180kb
14 Managing deepwater drilling developments €8.00 66kb
15 Pre-planning pays off! Free 355kb  
16 Well planning evaluation pays off! Free 138kb  
17 IADC Riser disconnect guidelines supplement €3.00 93kb
18 Active heave compensator article Free 15kb  
19        

Worked examples, calculations, theory and formulae

20

Maximum load on block no amplification (floating rig)

€2.00

38kb

21

Dynamic load amplification hook loads (floating rig)

€3.00

45kb

22

Derrick loading while running BOP (un damped)

€3.00

74kb

23

Dynamic casing loads from a floating rig (damped system)

€3.00

57kb

24

Evaluating deepwater shallow kill mud requirements

€2.00

37kb

25

Fracture gradient estimation

€2.00

31kb

26

Dual gradient riser mud boost calculation

€2.00

33kb

27

Dual gradient drilling riser boost while tripping evaluation €2.00 34kb

28

Mud mat capacity? €2.00 36kb
29 Conductor set down test evaluation €3.00 47kb
30 Soil resistance calculations while jetting €3.00 58kb
31 WOB evaluation while jetting? €3.00 46kb
32 Set up time after jetting conductor? €4.00 70kb
33 Bending load no deflection €2.00 35kb
34 Structural string combined loading evaluation €3.00 43kb
35 Riser-less drilling cuttings concentration and ROP evaluation €2.00 38kb
36 Dual gradient mud mix calculations €2.00 36kb
37 Dynamic drilling mud cost evaluation €3.00 38kb
38        

Mathcad Worksheets, Requires MATHCAD-11 SOFTWARE to be used

39

Maximum load on block no amplification (floating rig)

€3.00

12kb

40

Dynamic load amplification hook loads (floating rig)

€4.00

16kb

41

Derrick loading while running BOP (un damped)

€4.00

16kb

42

Dynamic casing loads from a floating rig (damped system)

€4.00

38kb

43

Evaluating deepwater shallow kill mud requirements

€3.00

24kb

44

Fracture gradient estimation €3.00 10kb

45

Dual gradient riser mud boost calculation €4.00 12kb

46

Dual gradient drilling riser boost while tripping evaluation €4.00 09kb

47

Mud mat capacity? €4.00 09kb

48

Conductor set down test evaluation €5.00 16kb
49 Soil resistance calculations while jetting €6.00 16kb
50 WOB evaluation while jetting? €7.00 17kb
51 Set up time after jetting conductor? €8.00 28kb
52 Bending load no deflection €3.00 67kb
53 Structural string combined loading evaluation €5.00 16kb
54 Riser-less drilling cuttings concentration and ROP evaluation €4.00 12kb
55 Dual gradient mud mix calculations €4.00 13kb
56 Dynamic drilling mud cost evaluation €6.00 16kb
57
58
59
Needs, requirements? complete the request form or e-mail us.

About Us | Drilling Operations | Doghouse News | Drilling Training | Technical Challenge
Drilling Interactive | On Line Shop | Downloads | Contact Us | Warranty

Site last updated April 2004

Hosted and Maintained by: One Giant Leap Design