|
Technical
|
| Note;
Basic well control files are under revision to include all
figures, illustrations etc |
|
01
|
BWC01; Intro to well control, 24 pp
|
€6.00
|
372kb
|
|
|
02
|
BWC02; Terms and definitions, 31 pp
|
€8.00
|
223kb
|
|
|
03
|
BWC03; Understanding pressure, 42 pp
|
€12.00
|
191kb
|
|
|
04
|
BWC4; Controlling and pressure limits, 29 pp
|
€9.00
|
384kb
|
|
|
05
|
BWC05 General well control considerations, 78 pp
|
€18.00
|
350kb
|
|
|
06
|
BWC06 Primary well control, 110 pp
|
€24.00
|
478kb
|
|
|
07
|
BWC07 Secondary well control, 104 pp
|
€22.00
|
484kb
|
|
|
08
|
BWC8; Well control equipment, 52 pp
|
€11.00
|
140kb
|
|
|
09
|
BWC9; Shallow gas, 48 pp
|
€12.00
|
128kb
|
|
|
10
|
BWC10; Special well control conditions, 127 pp |
€26.00
|
464kb
|
|
| 11 |
Kick prevention and detection practices |
€12.00 |
502kb |
|
| 12 |
Shallow gas guidelines |
€12.00 |
62kb |
|
| 13 |
Shallow well control guidelines |
€12.00 |
71kb |
|
| 14 |
Well control methods in horizontal and high angle wells |
€4.00 |
56kb |
|
| 15 |
Losses and gains guidelines |
€4.00 |
19kb |
|
| 16 |
Mud losses in reefal limestone guidelines |
€8.00 |
34kb |
|
| 17 |
HPHT well control considerations |
€8.00 |
50kb |
|
| 18 |
|
|
|
|
|
Worked examples, calculations, theory and formulae
|
|
19
|
Basic well control pressure calculations
|
€3.00
|
57kb
|
|
|
20
|
IWCF field units worksheet calculations
|
€4.00
|
132kb
|
|
|
21
|
IWCF SI units worksheet calculations
|
€3.00
|
96kb
|
|
|
22
|
Pressure gradients
|
€2.00
|
41kb
|
|
|
23
|
Initial shut in calculations
|
€2.00
|
44kb
|
|
|
24
|
Circulating a (conventional) kick
|
€2.00
|
54kb
|
|
|
25
|
Gas migrations rates estimation
|
€3.00
|
43kb
|
|
|
26
|
Gas cut mud
|
€4.00
|
129kb
|
|
|
27
|
Gas cut mud (strong white equation) |
€3.00
|
119kb |
|
|
28
|
Gas bubble (simplified calculations) |
€3.00
|
41kb |
|
| 29 |
Combined stripping method |
€12.00 |
153kb |
|
| 30 |
SI volumetric and stripping calculation worksheets (excel file) |
€8.00 |
46kb |
|
| 31 |
Field /mixed units volume and stripping calculation worksheets (excel file) |
€5.00 |
57kb |
|
| 32 |
Kick tolerance spreadsheet |
€4.00 |
46kb |
|
| 33 |
Well control worksheets (excel file) |
€4.00 |
157kb |
|
| 34 |
Wt & Wt Directional kPa (excel kick sheet) |
€4.00 |
136kb |
|
| 35 |
Wt & Wt Vert kPa (excel kick sheet) |
€4.00 |
128kb |
|
| 36 |
Well control fixed rig (excel kick sheet) |
€3.00 |
159kb |
|
| 37 |
Driller's Method, kPa (excel kick sheet) |
€3.00 |
122kb |
|
| 38 |
Kick tolerance design |
€5.00 |
90kb |
|
| 39 |
Well control 6 page (decision tree) guidelines |
€7.00 |
61kb |
|
| 40 |
Shallow kill mud estimation |
€3.00 |
31kb |
|
| 41 |
|
|
|
|
|
Mathcad Worksheets, Requires
MATHCAD-11 SOFTWARE to be used
|
|
42
|
Basic well control pressure calculations
|
€5.00
|
36kb
|
|
|
43
|
IWCF field units worksheet calculations
|
€6.00
|
88kb
|
|
|
44
|
IWCF SI units worksheet calculations
|
€5.00
|
61kb
|
|
|
45
|
Pressure gradients
|
€4.00
|
13kb
|
|
|
46
|
Initial shut in calculations
|
€4.00
|
21kb
|
|
|
47
|
Circulating a (conventional) kick |
€4.00
|
73kb |
|
|
48
|
Gas migrations rates estimation |
€5.00
|
19kb |
|
|
49
|
Gas cut mud
|
€6.00
|
708kb |
|
|
50
|
Gas cut mud (strong white equation) |
€5.00 |
373kb |
|
|
51
|
Gas bubble (simplified calculations) |
€5.00 |
18kb |
|
| 52 |
Kick tolerance design |
€8.00 |
1Mb |
|
| 53 |
Shallow kill mud estimation |
€4.00 |
11kb |
|
| 54 |
|
|
|
|
| Needs, requirements?
complete the request
form or e-mail
us. |