number crunching
welcome to kingdom drilling

 

Section 15; Bits, Well control

Needs, requirements? complete the request form or e-mail us.

Technical

Note; Basic well control files are under revision to include all figures, illustrations etc

01

BWC01; Intro to well control, 24 pp

€6.00

372kb

02

BWC02; Terms and definitions, 31 pp

€8.00

223kb

03

BWC03; Understanding pressure, 42 pp

€12.00

191kb

04

BWC4; Controlling and pressure limits, 29 pp

€9.00

384kb

05

BWC05 General well control considerations, 78 pp

€18.00

350kb

06

BWC06 Primary well control, 110 pp

€24.00

478kb

07

BWC07 Secondary well control, 104 pp

€22.00

484kb

08

BWC8; Well control equipment, 52 pp

€11.00

140kb

09

BWC9; Shallow gas, 48 pp

€12.00

128kb

10

BWC10; Special well control conditions, 127 pp €26.00 464kb
11 Kick prevention and detection practices €12.00 502kb
12 Shallow gas guidelines €12.00 62kb
13 Shallow well control guidelines €12.00 71kb
14 Well control methods in horizontal and high angle wells €4.00 56kb
15 Losses and gains guidelines €4.00 19kb
16 Mud losses in reefal limestone guidelines €8.00 34kb
17 HPHT well control considerations €8.00 50kb
18        

Worked examples, calculations, theory and formulae

19

Basic well control pressure calculations

€3.00

57kb

20

IWCF field units worksheet calculations

€4.00

132kb

21

IWCF SI units worksheet calculations

€3.00

96kb

22

Pressure gradients

€2.00

41kb

23

Initial shut in calculations

€2.00

44kb

24

Circulating a (conventional) kick

€2.00

54kb

25

Gas migrations rates estimation

€3.00

43kb

26

Gas cut mud

€4.00

129kb

27

Gas cut mud (strong white equation) €3.00 119kb

28

Gas bubble (simplified calculations) €3.00 41kb
29 Combined stripping method €12.00 153kb
30 SI volumetric and stripping calculation worksheets (excel file) €8.00 46kb
31 Field /mixed units volume and stripping calculation worksheets (excel file) €5.00 57kb
32 Kick tolerance spreadsheet €4.00 46kb
33 Well control worksheets (excel file) €4.00 157kb
34 Wt & Wt Directional kPa (excel kick sheet) €4.00 136kb
35 Wt & Wt Vert kPa (excel kick sheet) €4.00 128kb
36 Well control fixed rig (excel kick sheet) €3.00 159kb
37 Driller's Method, kPa (excel kick sheet) €3.00 122kb
38 Kick tolerance design €5.00 90kb
39 Well control 6 page (decision tree) guidelines €7.00 61kb
40 Shallow kill mud estimation €3.00 31kb
41        

Mathcad Worksheets, Requires MATHCAD-11 SOFTWARE to be used

42

Basic well control pressure calculations

€5.00

36kb

43

IWCF field units worksheet calculations

€6.00

88kb

44

IWCF SI units worksheet calculations

€5.00

61kb

45

Pressure gradients

€4.00

13kb

46

Initial shut in calculations

€4.00

21kb

47

Circulating a (conventional) kick €4.00 73kb

48

Gas migrations rates estimation €5.00 19kb

49

Gas cut mud €6.00 708kb

50

Gas cut mud (strong white equation) €5.00 373kb

51

Gas bubble (simplified calculations) €5.00 18kb
52 Kick tolerance design €8.00 1Mb
53 Shallow kill mud estimation €4.00 11kb
54
Needs, requirements? complete the request form or e-mail us.

About Us | Drilling Operations | Doghouse News | Drilling Training | Technical Challenge
Drilling Interactive | On Line Shop | Downloads | Contact Us | Warranty

Site last updated April 2004

Hosted and Maintained by: One Giant Leap Design