|
Technical
|
|
01
|
Rig acceptance guidelines
|
€8.00
|
155kb
|
|
|
02
|
Drilling facilities design guidelines
|
€8.00
|
163kb
|
|
|
03
|
Introduction to subsea wellhead equipment
|
€8.00
|
303kb
|
|
| 04 |
Introduction to jars and accelerators |
€8.00 |
876kb |
|
| 05 |
Quality assurance guidelines for DP drilling vessels |
€3.00 |
194kb |
|
| 06 |
|
|
|
|
|
Worked examples, calculations, theory and formulae
|
|
07
|
Non productive time report form (excel)
|
€2.00
|
31kb
|
|
|
08
|
Master equipment list excel files (offshore exploration well)
|
€12.00
|
430kb
|
|
|
09
|
Copy of RCEA rig inspection form
|
€2.00
|
216kb
|
|
|
10
|
Subsea BOP space-out worksheet
|
€2.00
|
66kb
|
|
|
11
|
Subsea accumulator test example
|
€2.00
|
171kb
|
|
| 12 |
Drawworks requirements |
€2.00 |
34kb |
|
| 13 |
Mud pump requirements |
€2.00 |
30kb |
|
| 14 |
Hoisting equipment |
€2.00 |
37kb |
|
| 15 |
Drilling derrick loading (drillpipe) |
€3.00 |
48kb |
|
| 16 |
Drilling derrick loading (drillpipe & casing) |
€3.00 |
58kb |
|
| 17 |
Drilling derrick loading (drillpipe, casing) and running BOPs |
€4.00 |
66kb |
|
| 18 |
|
|
|
|
|
Mathcad Worksheets, Requires
MATHCAD-11 SOFTWARE to be used
|
|
19
|
Drawworks requirements
|
€4.00
|
12kb
|
|
|
20
|
Mud pump requirements
|
€5.00
|
10kb
|
|
|
21
|
Hoisting equipment
|
€6.00
|
14kb
|
|
| 22 |
Drilling derrick loading (drillpipe) |
€7.00 |
23kb |
|
| 23 |
Drilling derrick loading (drillpipe & casing) |
€7.00 |
31kb |
|
| 24 |
Drilling derrick loading (drillpipe, casing) and running BOPs |
€8.00 |
38kb |
|
| 25 |
|
|
|
|
| Needs, requirements?
complete the request
form or e-mail
us. |