number crunching
welcome to kingdom drilling

 

Section 12; Mud & cement drilling fluids

Needs, requirements? complete the request form or e-mail us.

Technical

01

Mud contaminants

€9.00

146kb

02

Introduction to solids removal

€12.00

404kb

03

Reservoir muds and formation damage during drilling & workover

€12.00

338kb

04 Barite sag €8.00 101kb
05 Contingent squeeze cementing €5.00 41kb
06 Lost circulation while cementing €7.00 73kb
07 Optimising cementing guidelines €8.00 103kb
08 HPHT drilling fluid guidelines €12.00 97kb
09 HPHT cementing guidelines €10.00 106kb
10 10 Cmt plug horiz and high angle guidelines €4.00 26kb
11        

Worked examples, calculations, theory and formulae

12

Cement design (excel) worksheet

€4.00

22kb

13

Cement cost (excel) estimate worksheet

€4.00

38kb

14

Cement report template (excel)

€3.00

20kb

15

Liner cementing spreadsheet

€4.00

53kb

16

Offshore cementing spreadsheet worksheet examples (1)

€12.00

160kb

17 Offshore cementing spreadsheet worksheet examples (1) €10.00 110kb
18 Offshore cementing spreadsheet worksheet examples (1) €8.00 44kb
19 Balanced cement plug €3.00 71kb
20 Primary cementation €3.00 83kb
21 Will casing float? worked example €2.00 63kb
22 Squeeze cementing €3.00 90kb
23 Foamed cementing example €6.00 133kb
24        

Mathcad Worksheets, Requires MATHCAD-11 SOFTWARE to be used

25

Balanced cement plug

€5.00

88kb

26

Primary cementation

€6.00

108kb

27

Will casing float? worked example

€4.00

174kb

28 Squeeze cementing €6.00 130kb
29 Foamed cementing example €9.00 660kb
30        
Needs, requirements? complete the request form or e-mail us.

About Us | Drilling Operations | Doghouse News | Drilling Training | Technical Challenge
Drilling Interactive | On Line Shop | Downloads | Contact Us | Warranty

Site last updated April 2004

Hosted and Maintained by: One Giant Leap Design